Trade and home toolsElectrician Calculator

Cable size calculator: how to size a cable under BS 7671

How a cable size calculator works under BS 7671: current capacity, Ca Cg Ci derating, 3% and 5% voltage drop, and when you need an electrician.

5 min readBy Zarkon

On this page
  1. Who can size and install cables in the UK?
  2. How a cable size calculator works under BS 7671
  3. What these tools cannot cover on their own
  4. Where Electrician Calculator helps, and where it does not
  5. Questions people ask
  6. Sources

Who can size and install cables in the UK?

Electrical installations in the UK should follow BS 7671, the IET Wiring Regulations. The IET describes it as the national standard for electrical installations in the UK. The current edition is BS 7671:2018+A4:2026 (Amendment 4). The IET says the transition period for Amendment 2 ended on 15 October 2026, so Amendment 2 should no longer be referenced for new work.

In homes in England and Wales, Part P of the Building Regulations also applies. Electrical Safety First explains that, apart from some minor tasks, electrical work in a home must either be reported to building control or carried out by a registered electrician in a Government approved scheme. Homeowners and landlords must be able to prove the work meets Part P. Scotland uses its own Building Standards system, and Northern Ireland currently has no equivalent statutory requirement.

So, plainly: these tools are a design aid for one part of cable selection. They do not replace a qualified electrician, the full On-Site Guide, inspection and testing, or building control where the work is notifiable.

How a cable size calculator works under BS 7671

Appendix 4 of BS 7671 is where the current carrying capacity and voltage drop tables live. An IET Wiring Matters article on Appendix 4 sets out the starting relationships:

  1. Design current (Ib) is the current the circuit is meant to carry in normal service.
  2. Protective device rating (In) must be at least Ib.
  3. Cable current capacity (Iz) in the installed conditions must be at least In when overload protection is provided.
  4. Tabulated rating (It) from the Appendix 4 table is adjusted by rating factors to get Iz.

Common rating factors are Ca (ambient temperature), Cg (grouping) and Ci (thermal insulation). Buried cables can also need soil and depth factors. The IET explains Iz as the tabulated value multiplied by the applicable factors. When overload protection is provided, the cable is chosen so that Iz covers In after those factors, then voltage drop and the other Regulations checks still apply.

Voltage drop is part of sizing

A separate voltage drop check uses the matching mV/A/m table. The usual quick method is Voltage drop (V) = (mV/A/m) x Ib x L ÷ 1,000, where L is the run length in metres. Compare the result, as a percentage of supply voltage, with the recommended limits. myCableEngineering’s summary of Appendix 4 gives informative guide values for a public LV supply as 3% for lighting and 5% for other uses (6% and 8% on a private LV supply). Equipment needs and the total drop from the origin also matter. For a fuller walkthrough, see our voltage drop calculator under BS 7671 article.

A simple worked sketch (illustrative only)

Say Ib is 20 A, you choose In = 20 A, Ca = 0.94, Cg = 0.80 and Ci = 1.0. The required tabulated rating is roughly It ≥ In ÷ (Ca x Cg x Ci) = 20 ÷ (0.94 x 0.80) ≈ 26.6 A. You then look up the correct Appendix 4 table and reference method column, pick a size whose It meets that figure, and check voltage drop for the run length. The numbers only show the arithmetic. Always read It and mV/A/m from the printed tables for the cable you are actually using.

What these tools cannot cover on their own

Cable selection under BS 7671 is more than current capacity and voltage drop. The IET notes that protection against electric shock, thermal effects, overcurrent, voltage drop and terminal temperature limits all have to be considered together. Earth fault loop impedance, disconnection times, twin and earth tables (Table 4D5 and On-Site Guide methods for cable in insulation), and UK conduit fill are separate checks.

If you are not a qualified electrician, do not use any app or website to plan notifiable work yourself. Use a registered electrician, or notify building control where that is required.

Where Electrician Calculator helps, and where it does not

Electrician Calculator is our Android app for quick on site checks. You pick UK or US rules once. In UK mode it is labelled to BS 7671:2018+A4:2026 and uses Appendix 4 tables 4D1A (current capacity) and 4D1B (voltage drop). The cable sizer finds the smallest cable where Iz covers In after Ca, Cg and Ci, and voltage drop stays within 3% for lighting or 5% for other uses. Every result shows its working. Free includes 3 cable sizes. A one time Pro unlock adds an unlimited cable sizer, saved results grouped by job, and PDF job reports. US mode covers NEC ampacity, voltage drop and fill checks.

What it leaves out on purpose, rather than guessing: UK conduit fill, 90°C thermosetting and aluminium Iz tables, twin and earth tables, and earth fault loop impedance. Use the IET On-Site Guide and the full standards alongside the app for those.

What it is good for: a fast second check of your own sums, or a quick look at whether a longer run or tighter grouping is likely to need a bigger size. What it will not do: replace BS 7671, the On-Site Guide, judgement on site, inspection, testing, certification, or a registered electrician. Questions go to support@zarkon.co.uk.

Questions people ask

What does cable sizing check first?

Usually design current, the protective device rating, current carrying capacity after derating, then voltage drop. Other BS 7671 checks still apply.

What are Ca, Cg and Ci?

Rating factors from Appendix 4: Ca for ambient temperature, Cg for grouping, and Ci for thermal insulation. Buried cables can also need soil and depth factors.

Is 3% or 5% voltage drop a hard legal limit?

The Appendix 4 figures are recommended (informative) guide values for public supplies: 3% lighting, 5% other uses. Equipment needs and the total drop from the origin also matter.

Can I use an app instead of an electrician?

No. Notifiable work in England and Wales needs a registered electrician or building control notification, and Scotland has its own rules. The IET says BS 7671:2018+A4:2026 is the current edition.

Sources

  1. BS 7671 18th Edition Wiring RegulationsIET electrical.theiet.org
  2. Appendix 4 of BS 7671 (Mark Coles)IET Wiring Matters electrical.theiet.org
  3. Part P of the Building RegulationsElectrical Safety First electricalsafetyfirst.org.uk
  4. BS 7671 Voltage Drop CalculationsmyCableEngineering mycableengineering.com
  5. BS 7671 Appendix 4 TablesElec-Mate elec-mate.com
  6. Electrician CalculatorGoogle Play play.google.com